Difference between revisions of "T246030: Enable client side error logging in prod for small wiki"
From cpt
m (updated task from Phabricator) |
m (updated task from Phabricator) |
||
Line 5: | Line 5: | ||
|points= | |points= | ||
|dateCreated=1582569585 | |dateCreated=1582569585 | ||
|dateModified= | |dateModified=1584711117 | ||
|author={{Phabricator User | |author={{Phabricator User | ||
|type=author | |type=author | ||
Line 52: | Line 52: | ||
}}{{Phabricator Project | }}{{Phabricator Project | ||
|name=User-fgiunchedi | |name=User-fgiunchedi | ||
|column= | |column=Radar | ||
|entryDate= | |entryDate=1584711117 | ||
}}{{Phabricator Project | }}{{Phabricator Project | ||
|name=Wikimedia-Logstash | |name=Wikimedia-Logstash | ||
Line 64: | Line 64: | ||
}} | }} | ||
|transitions={{Transition | |transitions={{Transition | ||
|date=1584711117 | |||
|type=Entered Column | |||
|project=User-fgiunchedi | |||
|column=Radar | |||
}}{{Transition | |||
|date=1584711117 | |||
|type=Exited Column | |||
|project=User-fgiunchedi | |||
|column=Backlog | |||
}}{{Transition | |||
|date=1584368502 | |date=1584368502 | ||
|type=Entered Column | |type=Entered Column |
Revision as of 09:15, 20 March 2020
Phabricator Link | T246030 |
---|---|
Status | open |
Priority | High (red) |
Points | |
Phabricator Task Created | 2020/02/24 01:39 PM |
Wiki Page Created | 2020/02/24 02:16 PM |
Phabricator Task Last Modified | 2020/03/20 09:31 AM |
Wiki Page Last Updated | 2021/10/29 02:10 PM |
Phabricator Task Closed | |
Authored By | Nuria (Nuria) |
Assigned To | Ottomata (Andrew Otto) |
Projects |
|
Platform Engineering Initiative Column | |
Platform Team Workboards Column | |
Subtasks | |
Parent Tasks |
Column Transitions: (Added project: ⇑, Removed project: ⇓,Entered column: ⇒, Exited column: ⇐)
Project | Column | Date |
---|---|---|
⇑ Product-Infrastructure-Team-Backlog | 24 February 2020 | |
⇑ Patch-For-Review | 24 February 2020 | |
⇑ Better Use Of Data | 24 February 2020 | |
⇑ Desktop Improvements | 24 February 2020 | |
⇑ User-fgiunchedi | 24 February 2020 | |
⇑ Performance-Team (Radar) | 24 February 2020 | |
⇑ Analytics | 24 February 2020 | |
⇑ Wikimedia-Logstash | 24 February 2020 | |
⇑ Epic | 24 February 2020 | |
⇑ observability | 24 February 2020 | |
⇓ Patch-For-Review | 24 February 2020 | |
⇑ Analytics-Kanban | 26 February 2020 | |
Performance-Team (Radar) | ⇐ Limbo | 28 February 2020 |
Performance-Team (Radar) | ⇒ Watching | 28 February 2020 |
Analytics | ⇐ Incoming | 2 March 2020 |
Analytics | ⇒ Event Platform | 2 March 2020 |
⇑ Patch-For-Review | 2 March 2020 | |
⇑ MW-1.35-notes (1.35.0-wmf.24; 2020-03-17) | 4 March 2020 | |
⇓ Product-Infrastructure-Team-Backlog | 4 March 2020 | |
⇑ Product-Infrastructure-Team-Backlog (Kanban) | 4 March 2020 | |
Product-Infrastructure-Team-Backlog (Kanban) | ⇐ To Do | 4 March 2020 |
Product-Infrastructure-Team-Backlog (Kanban) | ⇒ Doing | 4 March 2020 |
⇓ MW-1.35-notes (1.35.0-wmf.24; 2020-03-17) | 4 March 2020 | |
⇑ MW-1.35-notes (1.35.0-wmf.21; 2020-02-25) | 4 March 2020 | |
⇓ MW-1.35-notes (1.35.0-wmf.21; 2020-02-25) | 4 March 2020 | |
⇑ MW-1.35-notes (1.35.0-wmf.22; 2020-03-03) | 4 March 2020 | |
Analytics-Kanban | ⇐ Next Up | 4 March 2020 |
Analytics-Kanban | ⇒ In Code Review | 4 March 2020 |
Analytics-Kanban | ⇐ In Code Review | 4 March 2020 |
Analytics-Kanban | ⇒ In Progress | 4 March 2020 |
Analytics-Kanban | ⇐ In Progress | 4 March 2020 |
Analytics-Kanban | ⇒ In Progress | 4 March 2020 |
⇓ MW-1.35-notes (1.35.0-wmf.22; 2020-03-03) | 4 March 2020 | |
⇑ MW-1.35-notes (1.35.0-wmf.24; 2020-03-17) | 4 March 2020 | |
⇓ MW-1.35-notes (1.35.0-wmf.24; 2020-03-17) | 5 March 2020 | |
⇑ MW-1.35-notes (1.35.0-wmf.23; 2020-03-10) | 5 March 2020 | |
Analytics-Kanban | ⇐ In Progress | 10 March 2020 |
Analytics-Kanban | ⇒ Done | 10 March 2020 |
Analytics-Kanban | ⇐ Done | 11 March 2020 |
Analytics-Kanban | ⇒ Done | 11 March 2020 |
observability | ⇐ Inbox | 16 March 2020 |
observability | ⇒ In progress | 16 March 2020 |
User-fgiunchedi | ⇐ Backlog | 20 March 2020 |
User-fgiunchedi | ⇒ Radar | 20 March 2020 |
Product-Infrastructure-Team-Backlog (Kanban) | ⇐ Doing | 31 March 2020 |
Product-Infrastructure-Team-Backlog (Kanban) | ⇒ Sign off | 31 March 2020 |