This site is no longer actively maintained. It exists for historical purposes as an example of Phabricator integration and Lua scripting.

Difference between revisions of "T263841: RFC: Expand API title generator to support other generated data"

From cpt
m (updated task from Phabricator)
m (updated task from Phabricator)
Line 5: Line 5:
|points=
|points=
|dateCreated=1601035265
|dateCreated=1601035265
|dateModified=1608139758
|dateModified=1608208684
|author={{Phabricator User
|author={{Phabricator User
|type=author
|type=author
Line 25: Line 25:
}}{{Phabricator Project
}}{{Phabricator Project
|name=TechCom-RFC
|name=TechCom-RFC
|column=P3: Explore
|column=P5: Last Call
|entryDate=1605035446
|entryDate=1608205682
}}
}}
|transitions={{Transition
|transitions={{Transition
|date=1608205682
|type=Entered Column
|project=TechCom-RFC
|column=P5: Last Call
}}{{Transition
|date=1608205682
|type=Exited Column
|project=TechCom-RFC
|column=P3: Explore
}}{{Transition
|date=1607516161
|date=1607516161
|type=Entered Column
|type=Entered Column

Revision as of 08:23, 17 December 2020

Phabricator Link T263841
Status open
Priority Medium (orange)
Points
Phabricator Task Created 2020/09/25 08:01 AM
Wiki Page Created 2020/10/27 01:20 PM
Phabricator Task Last Modified 2020/12/17 07:38 AM
Wiki Page Last Updated 2021/01/11 04:23 PM
Phabricator Task Closed
Authored By matthiasmullie (Matthias Mullie)
Assigned To matthiasmullie (Matthias Mullie)
Projects
Platform Engineering Initiative Column
Platform Team Workboards Column
Subtasks
    Parent Tasks


    Column Transitions: (Added project: ⇑, Removed project: ⇓,Entered column: ⇒, Exited column: ⇐)

    Project Column Date
    Structured-Data-Backlog (Current Work) 25 September 2020
    TechCom-RFC 25 September 2020
    Structured-Data-Backlog (Current Work) Incoming 28 September 2020
    Structured-Data-Backlog (Current Work) Blocked 28 September 2020
    TechCom-RFC P1: Define 27 October 2020
    TechCom-RFC P3: Explore 27 October 2020
    Platform Engineering 27 October 2020
    TechCom-RFC P3: Explore 2 November 2020
    TechCom-RFC P2: Resource 2 November 2020
    Discovery-Search 3 November 2020
    Discovery-Search 9 November 2020
    Discovery-Search needs triage 9 November 2020
    Discovery-Search Current work 9 November 2020
    Discovery-Search (Current work) 9 November 2020
    TechCom-RFC P2: Resource 10 November 2020
    TechCom-RFC P3: Explore 10 November 2020
    Platform Engineering Inbox 10 November 2020
    Platform Engineering Tracking/Watching 10 November 2020
    Discovery-Search (Current work) Incoming 16 November 2020
    Discovery-Search (Current work) Blocked (from outside the team) 16 November 2020
    Platform Engineering Tracking/Watching 2 December 2020
    Platform Engineering Tech Planning Review 2 December 2020
    Platform Engineering Tech Planning Review 9 December 2020
    Platform Engineering Tracking/Watching 9 December 2020
    TechCom-RFC P3: Explore 17 December 2020
    TechCom-RFC P5: Last Call 17 December 2020
    TechCom-RFC 8 January 2021
    TechCom-RFC (TechCom-RFC-Closed) 8 January 2021
    TechCom-RFC (TechCom-RFC-Closed) Untriaged 8 January 2021
    TechCom-RFC (TechCom-RFC-Closed) Approved 8 January 2021
    Discovery-Search (Current work) Blocked (from outside the team) 11 January 2021
    Discovery-Search (Current work) Needs Reporting 11 January 2021