This site is no longer actively maintained. It exists for historical purposes as an example of Phabricator integration and Lua scripting.

Difference between revisions of "T225192: Phester: Support running the same tests with several sets of parameters (test cases)"

From cpt
m (updated task from Phabricator)
m (updated task from Phabricator)
 
(4 intermediate revisions by the same user not shown)
Line 18: Line 18:
}}
}}
|projects={{Phabricator Project
|projects={{Phabricator Project
|name=CPT Initiatives
|name=Platform Team Initiatives
|column=API Integration Tests
|column=API Integration Tests
|entryDate=1559817082
|entryDate=1559817082
Line 24: Line 24:
|name=Code-Health
|name=Code-Health
|entryDate=1559817082
|entryDate=1559817082
}}
|transitions={{Transition
|date=1564168112
|type=Removed Project
|project=Platform Engineering (API Integration Tests)
}}{{Transition
|date=1564168112
|type=Added Project
|project=Platform Team Initiatives (API Integration Tests)
}}{{Transition
|date=1564168112
|type=Entered Column
|project=Platform Engineering
|column=mop
}}{{Transition
|date=1564168112
|type=Exited Column
|project=Platform Engineering
|column=API Integration Tests
}}{{Transition
|date=1562699160
|type=Removed Project
|project=Platform Engineering (Needs Cleaning - Code Health (TEC13))
}}{{Transition
|date=1562699160
|type=Added Project
|project=Platform Engineering (API Integration Tests)
}}{{Transition
|date=1559817082
|type=Added Project
|project=Platform Engineering (Needs Cleaning - Code Health (TEC13))
}}{{Transition
|date=1559817082
|type=Added Project
|project=Code-Health
}}
}}
}}
}}

Latest revision as of 10:36, 22 July 2020

Phabricator Link T225192
Status invalid
Priority Needs Triage (violet)
Points
Phabricator Task Created 2019/06/06 06:31 AM
Wiki Page Created 2019/06/09 01:16 PM
Phabricator Task Last Modified 2019/08/12 02:59 PM
Wiki Page Last Updated 2020/07/22 11:36 AM
Phabricator Task Closed 2019/08/12 02:48 PM
Authored By daniel (Daniel Kinzler)
Assigned To Clarakosi (Clara Andrew-Wani)
Projects
Platform Engineering Initiative Column API Integration Tests
Platform Team Workboards Column
Subtasks
    Parent Tasks


    Column Transitions: (Added project: ⇑, Removed project: ⇓,Entered column: ⇒, Exited column: ⇐)

    Project Column Date
    Code-Health 6 June 2019
    Platform Engineering (Needs Cleaning - Code Health (TEC13)) 6 June 2019
    Platform Engineering (Needs Cleaning - Code Health (TEC13)) 9 July 2019
    Platform Engineering (API Integration Tests) 9 July 2019
    Platform Engineering (API Integration Tests) 26 July 2019
    Platform Engineering API Integration Tests 26 July 2019
    Platform Engineering mop 26 July 2019
    Platform Team Initiatives (API Integration Tests) 26 July 2019