This site is no longer actively maintained. It exists for historical purposes as an example of Phabricator integration and Lua scripting.

Difference between revisions of "T114271: Audit *all* datastores to see how DR failover is handled"

From cpt
m (updated task from Phabricator)
m (updated task from Phabricator)
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
|points=
|points=
|dateCreated=1443634312
|dateCreated=1443634312
|dateModified=1593705913
|dateModified=1611606905
|author={{Phabricator User
|author={{Phabricator User
|type=author
|type=author
Line 63: Line 63:
|date=1563332633
|date=1563332633
|type=Removed Project
|type=Removed Project
|project= Platform Team Legacy (Designing)
|project=Platform Team Legacy (Designing)
}}{{Transition
}}{{Transition
|date=1563332633
|date=1563332633
Line 83: Line 83:
|date=1552591893
|date=1552591893
|type=Added Project
|type=Added Project
|project= Platform Team Legacy (Designing)
|project=Platform Team Legacy (Designing)
}}{{Transition
}}{{Transition
|date=1505302868
|date=1505302868
Line 103: Line 103:
|type=Exited Column
|type=Exited Column
|project=Performance-Team
|project=Performance-Team
|column=Backlog: Small & Maintenance
|column=Backlog: Maintenance
}}{{Transition
}}{{Transition
|date=1444068921
|date=1444068921
|type=Entered Column
|type=Entered Column
|project=Performance-Team
|project=Performance-Team
|column=Backlog: Small & Maintenance
|column=Backlog: Maintenance
}}{{Transition
}}{{Transition
|date=1444068921
|date=1444068921

Latest revision as of 17:43, 22 April 2021

Phabricator Link T114271
Status open
Priority Medium (orange)
Points
Phabricator Task Created 2015/09/30 01:31 PM
Wiki Page Created 2019/06/09 01:22 PM
Phabricator Task Last Modified 2021/01/25 03:35 PM
Wiki Page Last Updated 2021/04/22 06:43 PM
Phabricator Task Closed
Authored By aaron (Aaron Schulz)
Assigned To
Projects
Platform Engineering Initiative Column
Platform Team Workboards Column
Subtasks
Parent Tasks


Column Transitions: (Added project: ⇑, Removed project: ⇓,Entered column: ⇒, Exited column: ⇐)

Project Column Date
Performance-Team Inbox 5 October 2015
Performance-Team Backlog: Maintenance 5 October 2015
Performance-Team Backlog: Maintenance 13 September 2017
Performance-Team Radar 13 September 2017
Performance-Team (Radar) Limbo 13 September 2017
Performance-Team (Radar) Watching 13 September 2017
Platform Engineering (Multi-DC (TEC1)) 14 March 2019
User-mobrovac 14 March 2019
Platform Team Legacy (Designing) 14 March 2019
Services (designing) 14 March 2019
Platform Team Legacy (Designing) 16 July 2019
Services (designing) 16 July 2019
Platform Engineering (Multi-DC (TEC1)) 26 July 2019
Platform Engineering Multi-DC (TEC1) 26 July 2019
Platform Engineering mop 26 July 2019
Platform Team Initiatives (Multi-DC (TEC1)) 26 July 2019
Platform Team Initiatives (Multi-DC (TEC1)) 24 March 2020
Sustainability (MediaWiki-MultiDC) Later 2 July 2020
Sustainability (MediaWiki-MultiDC) Later 2 July 2020