This site is no longer actively maintained. It exists for historical purposes as an example of Phabricator integration and Lua scripting.

Difference between revisions of "T259710: MEP pilot instrument/schema #2 (SessionLength)"

From cpt
m (updated task from Phabricator)
m (updated task from Phabricator)
Line 17: Line 17:
}}{{Phabricator Project
}}{{Phabricator Project
|name=Product-Infrastructure-Data
|name=Product-Infrastructure-Data
|column=Backlog
|column=Task Backlog
|entryDate=1596647460
|entryDate=1596647460
}}
}}
Line 25: Line 25:
|type=Entered Column
|type=Entered Column
|project=Product-Infrastructure-Data
|project=Product-Infrastructure-Data
|column=Backlog
|column=Task Backlog
}}{{Transition
}}{{Transition
|date=1596647460
|date=1596647460

Revision as of 14:33, 27 August 2020

Phabricator Link T259710
Status open
Priority Needs Triage (violet)
Points
Phabricator Task Created 2020/08/05 09:20 AM
Wiki Page Created 2020/08/05 10:28 AM
Phabricator Task Last Modified 2020/08/26 08:55 AM
Wiki Page Last Updated 2021/01/28 09:06 AM
Phabricator Task Closed
Authored By jlinehan (Jason Linehan)
Assigned To jlinehan (Jason Linehan)
Projects
Platform Engineering Initiative Column
Platform Team Workboards Column
Subtasks
Parent Tasks


Column Transitions: (Added project: ⇑, Removed project: ⇓,Entered column: ⇒, Exited column: ⇐)

Project Column Date
Better Use Of Data 5 August 2020
Product-Data-Infrastructure 5 August 2020
Product-Data-Infrastructure Inbox 5 August 2020
Product-Data-Infrastructure Task Backlog 5 August 2020
Product-Data-Infrastructure Task Backlog 8 September 2020
Product-Data-Infrastructure Doing 8 September 2020
Product-Data-Infrastructure Doing 14 September 2020
Product-Data-Infrastructure Reviewing 14 September 2020