This site is no longer actively maintained. It exists for historical purposes as an example of Phabricator integration and Lua scripting.

Tasks By Project

From cpt

Project: Collaboration-Team-Archive-2015-2016

Switch to Active Tasks 5 Phabricator task(s).

Phabricator Link Wiki Link Status Priority Author Assignee Projects Subtasks Parent Tasks
T110721 T110721: Switch Flow to use Parsoid v3 API with VirtualRESTService resolved High (red)
    T119566 T119566: Add dry-run mode to Flow External Store migration script resolved High (red)
      T94028 T94028: DB master connections requested by Flow on GET/HEAD requests resolved High (red)
      T94029 T94029: Spike: Avoid use of merge() in Flow caches resolved High (red)
        T95871 T95871: Use External Store on Beta Cluster resolved Medium (orange)